Coat Structural Steel, Monorails,SO2 Pipe Line
| Value: | $100,000 |
|---|---|
| Material: | Wasser Prepbond and MC Luster, Termarust, Barrust 235, T-5 Xylene, KleenBlast, Wasser Thinner, Iterzone 954 Epoxy |
| Amounts: | Wasser Luster -2 gl, Wasser Prepbond – 1gl, Termarust – 13 gl, Barrust 235, 15 GL, T-5 Xylene – 5 GL, KleenBlast – 6400 LB, Wasser Thinner – 1 GL, Interzone 954 1gl |
| Equipment: | Vactor Truck, Genie S85 Boom, Scaffold, 185 CFM Compressor, Air Dryer, MST, Dust collector, 600 LB Blast Pot, 3500 PSI Pressure Washer |
| No of Employees: | 5 |
| Special Safety: | Fall Protection, Man lift Ticket, First Aid, Hot Work Permits, Fire Watch, Emergency Showers, Eyewash Station |
| Duration: | October 25, 2004 – November 12, 2004 |