Mainroad Contracting Ltd.
Bridge Expansion Joint Trough Replacement
| Value: | $100,000 |
|---|---|
| Material: | Kleen Blast, Carbothane, Carbomastic, Thinner 10, Thinner T25 |
| Amounts: | Kleen Blast – 3280 lb, Thinner T 25 – 3 gal, Thinner 10 – 2 gal, Carbothane 134 – 6 gal, Carbomastic – 6 gal |
| Equipment: | 375 CFM compressor and air dryer, 3 KW Generator, 3500 PSI Pressure Washer, 600 lb blast pot. |
| No of Employees: | 4 |
| Special Safety: | Traffic control, rolling containment. |
| Duration: | Sept 5, 2006 – June 4, 2007 |