Public Works & Gov. Service

Repaint – Liard Bridge

Finished Project

Finished Project


In Progress

In Progress

In Progress

Value: $4,000,000
Material: MEK, Sil7 sand, Steel shot, Carbozinc 859, Carbothane 134 HG, Carboline 888, Thinner 25, Thinner 33, Rustbond, thinner 76
Amounts: MEK – 498 KG, Sil7 Sand -649,980 lb, Steel shot – 30 Tons, Carbozinc 859 – 296 kg, Carbothane 134HG – 703 gal, Carboline 888 – 1345 gal, Thinner 25 – 120 gal, Thinner 33 – 120 gal, Rustbond – 78 gal, Thinner 76 – 50 gal
Equipment: MST, Office Trailer, 3 x 8 man Sleeping Trailers, Light Towers, 3 x 350M BTU Heater, 1600cfm and 375cfm compressors, 4 x 6KW Generator, 10,000lb zoom boom, 750KW Generator, Air Dryer, Trash Pump, 30kw Generator, 75KW Generator, 45’ Boom Lift, 4000psi Pressure Washer, Traffic Lights, 6500KW Generator, 10,000 gallon fuel Tank, 40DC diesel Dust Collector, 8 ton bulk pot, 2250 cfm Dehumidifier, 6 shower decontamination trailer, Freightliner, Steel Shot Recycler, 3 x 500gl Tank, Enviro-tank, Scaffold, Fencing, Boat, 80:1, 68:1 and 45:1 airless spray pumps
No of Employees: 25
Special Safety: Lead abatement, blood tests, negative air scaffold and shrink wrap containments, fuel powered equipment containments, fall protection, spill kits, fire extinguishers, eye wash stations, respirators, purified supplied air.
Duration: May 13, 2007 – to be completed in spring 2008