Ministry of Transportation and Infrastructure

Iron Workers Memorial Bridge

Iron Workers Memorial Bridge

Value: $1,900,000
Material: Sika Fix PU, Carboline 890, Carbozinc 859, Carboline 893, Carbothane 134, – Thinner 2, Thinner 25,, Rustbond FC – Steel Grit
Amounts: Sika-Fix PU – Flex Grout – 16 (11.25 liters Pails) Carboline 890 – 30 Gal, Thinner 2 – 160 Gal, Thinner 25 – 105 Gal, Carbozinc 859 347 Gal, Carbothane 134 –300 Gal, Rustbond FC Green – 2 Gal, Carboline 893 – Grey – 470 Gal, Steel Grit 20 ton
Equipment: Trucks, 100 KV Generator, ARS Steel Grit Recycler, Decontamination Trailer, 3 x King Pump, 375 CFM Breathing Air Compressor, Zoom Boom, 24k Dust Collector, 2 x 4000 psi Pressure Washer, 1200’ of Quik Deck Scaffolding, Beam Trolley, 3 x Office/Lunch Trailers, 2 x Light Towers, 1600 CFM Compressor, 136,000BTU Heaters, 900CFM Compressor, Air Tugger
No of Employees: 44
Special Safety: Lead Abatement, Blood tests, Full containment negative air Class 6 Scaffold and shrink wrap containment, decontamination showers, fall protection, full face supplied breathing air for urethane application. Spill kits, fire extinguishers, eye wash stations, respirators
Duration: November 21/08 – July 13/09