Ministry of Transportation and Infrastructure
Iron Workers Memorial Bridge

| Value: | $1,900,000 |
|---|---|
| Material: | Sika Fix PU, Carboline 890, Carbozinc 859, Carboline 893, Carbothane 134, – Thinner 2, Thinner 25,, Rustbond FC – Steel Grit |
| Amounts: | Sika-Fix PU – Flex Grout – 16 (11.25 liters Pails) Carboline 890 – 30 Gal, Thinner 2 – 160 Gal, Thinner 25 – 105 Gal, Carbozinc 859 347 Gal, Carbothane 134 –300 Gal, Rustbond FC Green – 2 Gal, Carboline 893 – Grey – 470 Gal, Steel Grit 20 ton |
| Equipment: | Trucks, 100 KV Generator, ARS Steel Grit Recycler, Decontamination Trailer, 3 x King Pump, 375 CFM Breathing Air Compressor, Zoom Boom, 24k Dust Collector, 2 x 4000 psi Pressure Washer, 1200’ of Quik Deck Scaffolding, Beam Trolley, 3 x Office/Lunch Trailers, 2 x Light Towers, 1600 CFM Compressor, 136,000BTU Heaters, 900CFM Compressor, Air Tugger |
| No of Employees: | 44 |
| Special Safety: | Lead Abatement, Blood tests, Full containment negative air Class 6 Scaffold and shrink wrap containment, decontamination showers, fall protection, full face supplied breathing air for urethane application. Spill kits, fire extinguishers, eye wash stations, respirators |
| Duration: | November 21/08 – July 13/09 |