General Electric/BC Hydro, Bennet Dam

WAC Bennet Dam, Hudson’s Hope Asbestos Abatement, AB Corn Cob Grit, Removal of Acrylic Varnish Containing Crysotile Asbestos on Stator Unit

Value: $200,000
Material: Corn Cob Grit
Amounts: 6300 lbs
Equipment: Two – 600 lb Blast Pots, Scaffolding, Dust Collector, Vactor Truck, 1990 HP Negative Air Machine. MST Unit, Wash car, 750 CFM compressor, Air Dryer
No of Employees: 4
Special Safety: Scaffold, Negative Air Shrink Wrap Containment, Decontamination Trailer, PAPR Inside Clean Air Supplied Blast Hoods, Dust Collection with HEPA Filtration, Clean up and Waste Removal
Duration: January 8, 2004 – February 5, 2004