Power Generation Projects

Andritz Hydro – EB Campbell Dam

As sub-contractor to Andritz Hydro, contracted to remove existing lead based coatings from generator components, scroll case and 2 upstream gates.

full details »

F & M Installations

Upgrade to Revelstoke Dam

full details »

Voith Hydro

Unit 5 Scroll Case Upgrade, Revelstoke Dam


full details »

Western Versatile Construction Corp.

Aberfeldie Redevelopment Project

full details »

Brymark Installations Group

Lead Paint removal and Corrosion Protection at BC Hydro Burrard Generating station

full details »

BC Hydro/ VaTech Hydro Canada Inc.

Repaint at Peace Canyon Dam

Completed Interior

Completed Interior

full details »

General Electric/BC Hydro

AB, Lead Abatement, Epoxy Paint Scroll Case and Lining

GE

full details »

General Electric/BC Hydro

UHWJ And Coat Half-Floor Piping, , UHWJ Lead Abatement Removal Of Coating From Paint Runner, Stay Vane And Ring, UHWJ Removal Of Foam Containing Asbestos From Penstock Expansion Joint And Application Of High Solids Epoxy, Urethane Coatings, And 100% Polyurethane Foam
full details »

BC Hydro

AB, Service and Radial Gates, removal of coal tar epoxy, welding repair, Application of new epoxy coating and moisture cure polyurethane caulking
full details »

General Electric/BC Hydro, Bennet Dam

WAC Bennet Dam, Hudson’s Hope Asbestos Abatement, AB Corn Cob Grit, Removal of Acrylic Varnish Containing Crysotile Asbestos on Stator Unit
full details »

General Electric/BC Hydro

Lead Abatement, AB, Removal of Existing Paint Containing Lead on Scroll Stay Vanes, Pit Liner and Associated Components, Application Of Epoxy and Urethane Coating, Clean-up and Waste Removal
full details »